Tigubako School Dormitory
GPS Coordinates:
-8.170774(lat), 159.615423(lng)
Province:
Isabel
Ward:
Tirotongana
Village:
Tirotonna
Cycle:
Cycle6
Nature of Sub-project:
New
-
-
-
Subproject Objective:
To build a proper and permanent Dormitory building which will provide a safe, comfortable and better accommodation for boarding school children around the catchment villages.
Brief Description:
Days schooling in particular travelling school children that attended school at Toritonga primary school often have to face harsh climate condition and traveled long distance daily in order to attend classes. For children as young as 8 years old, this practice makes their learning difficulty and deprived their privilege to attend school daily. This project will help the catchment villages to accommodate their children weekly to avoid traveling in long distance in order to attend class. The building is designed to accommodate more than 50 children and also the growing number of children in the future. The building will include two toilet blocks, a storage room and three separate rooms.
Date approved by Province:
23/10/2019
Date TDF approved:
27/01/2019
Community Helper name:
Selwyn Getu
Is this project added because of a discontinued project:
No
Subproject Type:
Dormitory
Sector:
Education
Subsector:
Primary Education
Date of SIC establishment meeting:
07/08/2019
Agreed name of SIC:
Tigubako Primary School Dormitory Project
SIC Executive Members:
Position (given)
Name
Gender M/F (select)
Chairperson
Mostyn Lehui
Male
Treasurer/Accountant
Nesis Fotamana
Male
Secretary
Doreen Farlegu
Female
Technical Officer
Fosta Heta
Male
Youth Member
Nelson Theomae
Male
Member1
Samson Aumae
Male
Member2
Hudson Pujadi
Female
Member3
Glen Kiko
Male
Total Beneficiaries
Age Group
Male
Female
Total
0 - 14 yrs
42
47
89
15 - 24 yrs
51
51
102
25 - 59 yrs
68
67
135
60+ yrs
6
8
14
Total
167
173
340
People with special needs:
2
Households:
47
Names of villages expected to benefit and number of beneficiaries:
Tirotonna
Age Group
Male
Female
Total
0 - 14 yrs
42
47
89
15 - 24 yrs
51
51
102
25 - 59 yrs
68
67
135
60+
6
8
14
Total
167
173
340
People with special needs
2
Households
47
Work plan stages and activities:
Stage1
Completed
Procurement/Preliminaries
Yes
Procurement of hardware materials
Yes
Timber milling contract
Yes
Construction supervision contract
Yes
Stage2
Completed
Building pre-construction community workshop
Yes
Transport of hardware materials to village
Yes
C1.15 (d) part 11 - Construction phase environment mitigation agreed
Yes
Environment and culture protection areas identified and clearly marked
Yes
Stage3
Completed
Collect and deliver sand and gravel on site
Yes
Collect and deliver timber on site
Yes
Site clearance of proposed site
Yes
Stage4
Completed
Erection of building profiling and excavation of footings
Yes
Install reinforcement, caging and bending fro column, pad footing strip footing
Yes
Inspection of reinforcement for all foundations before concreting to meet TDF requirements.
Yes
Constructing formwork for column, pad footing and strip footing
Yes
Concreting of column, pad footing and strip footing
Yes
Stage5
Completed
Constructing of bearers structures
Yes
Construction of floor joist structures
Yes
Constructing of wall framing structures, window frame and door frame
Yes
Constructing of noggins, lintels and bracing of wall structures
Yes
Inspection of framing to meet TDF requirements
Yes
Stage6
Completed
Construction of roof framing and purlin structures
Yes
Over laid chicken mesh wire on roof structure
Yes
Constructing fascia board and bracing
Yes
Sisalation paper and roofing iron on chicken mesh
Yes
Inspection of roofing framing to meet TDF requirements
Yes
Stage7
Completed
Constructing external wall lining
Yes
Constructing flooring board lining
Yes
Construction ceiling framing structures and install lining
Yes
Constructing wall lining
Yes
Constructing of architrave
Yes
Stage8
Completed
Excavate septic tank and soak away pits
Yes
Construct tank with reinforcement and concrete blocks
Yes
Construct soak away pit with concrete and stones
Yes
Installation of plumbing work inside building
Yes
Connect water to building plumbing to septic tank
Yes
Stage9
Completed
Patty, filling and sand paper walls and timbers
Yes
Painting and decorating
Yes
Dismantling scaffold
Yes
Clean up site, remove nails and stock pile and spare materials
Yes
Cleaning and drainage work
Yes
Stage10
Completed
Building Post-Construction workshop
No
Building maintenance
No
Building service maintenance (septic & sanitation)
No
Painting and decorating maintenance
No
Landscaping and beautification of building site
No
Community procurement plan. List of up to 20 items/contracts: